THE GOVERNMENT OF MOSCOW

RESOLUTION

ON ESTABLISHING THE MINIMUM SIZE OF CONTRIBUTION FOR CAPITAL REPAIRS OF COMMON PROPERTY IN APARTMENT BUILDINGS IN THE TERRITORY OF MOSCOW

In accordance with Article 167 Housing Code of the Russian Federation and part 2 of Article 7 of the Moscow City Law of January 27, 2010 No. 2 “Fundamentals of the housing policy of the city of Moscow” The Moscow Government decides:

  1. Establish that minimum size contribution for major repairs common property in apartment buildings in the city of Moscow (hereinafter referred to as the minimum contribution for capital repairs) is calculated in rubles per square meter of the total area of ​​the premises in apartment building based on an assessment of the need for funds to finance services and (or) work on major repairs of common property in apartment buildings in the city of Moscow, included in the list of services and (or) work on major repairs of common property in an apartment building in the city of Moscow.
  2. Set the minimum contribution for major repairs from July 1, 2017 at 17 rubles per square meter of total area of ​​residential (non-residential) premises in an apartment building per month. The minimum contribution for capital repairs is subject to annual adjustment taking into account changes in the consumer price index.
  1. Approve a list of works and (or) services for major repairs of common property in apartment buildings in the city of Moscow, the provision and (or) implementation of which is financed from funds overhaul, formed on the basis of the minimum amount of contribution for major repairs (Appendix).
  2. Establish that:

4.1. The decision to determine the method of forming a capital repair fund must be made and implemented by the owners of premises in an apartment building within 5 months after the official publication of the regional program for capital repairs of common property in apartment buildings in Moscow (hereinafter referred to as the regional program), in which the apartment building is included , in relation to which the issue of choosing a method for forming its capital repair fund is being decided.

4.1(1). The obligation to pay contributions for major repairs from the owners of premises in an apartment building, put into operation after the approval of the regional program and included in the regional program when updating it, arises after 8 calendar months, starting from the first day of the month following the month of the official publication of the legal act of the Government Moscow, for which such an apartment building is included in the regional program.

4.2. Social support measures for certain categories of citizens to pay for housing apply to the payment of contributions for major repairs of common property in apartment buildings.

4.2(1). A discount of 50 percent on the payment of a contribution for the overhaul of common property in apartment buildings based on the occupied total area of ​​​​residential premises owned by citizens, within the social norm for the area of ​​​​residential premises, is carried out at the expense of the budget of the city of Moscow and is provided:

– disabled people and families with disabled children;

– persons awarded the medal “For the Defense of Moscow”;

– persons living in Moscow and continuously working at enterprises, organizations and institutions of Moscow, undergoing military service in the city from July 22, 1941 to January 25, 1942;

– citizens awarded the badge “Honorary Donor of Russia” or “Honorary Donor of the USSR”;

– citizens awarded the “Honorary Donor of Moscow” badge;

large families, in which three or more children were born and (or) raised (including adopted children, as well as stepchildren and stepchildren) until the youngest of them reaches the age of 16 years, and students in educational organizations implementing basic educational programs of primary general education, basic general education, secondary general education - until the age of 18;

– families with 10 or more children under the age of 16, as well as over 16 years old if they are students educational organizations implementing basic educational programs of primary general education, basic general education, and secondary general education.

4.2(2). Social support measures for certain categories of citizens for paying contributions for major repairs of common property in apartment buildings are provided to citizens for no more than one apartment (residential premises) based on the minimum amount of contributions for major repairs established by this resolution.

4.2(3). If the owner of a residential premises has the right to social support measures for paying a contribution for major repairs of common property in an apartment building on two or more grounds, these social support measures are provided to him on one of the grounds at the choice of the citizen.

  1. Control over the implementation of this resolution is entrusted to the Deputy Mayor of Moscow in the Moscow Government for Housing, Communal Services and Landscaping, P.P. Biryukov.

Mayor of Moscow

S.S. Sobyanin

Appendix to the resolution of the Moscow Government

SCROLL

WORK AND (OR) SERVICES FOR CAPITAL REPAIRS OF COMMON PROPERTY IN MULTIPLE APARTMENT BUILDINGS IN THE TERRITORY OF THE CITY OF MOSCOW, THE PROVISION AND (OR) IMPLEMENTATION OF WHICH ARE FINANCED FROM THE CAPITAL REPAIR FUNDS FORMED ON THE BASIS FROM THE MINIMUM CONTRIBUTION FOR CAPITAL REPAIRS

  1. In-house repairs engineering systems electricity supply
  2. Repair of in-house engineering heat supply systems.
  3. Repair of in-house gas supply systems.
  4. Repair of in-house engineering water supply systems (hot and cold water supply).
  5. Repair of in-house engineering drainage (sewage) systems.
  6. Repair or replacement of elevator equipment deemed unsuitable for operation, repair of elevator shafts.
  7. Roof repair.
  8. Repair basements related to common property in an apartment building.
  9. Facade repair.

9(1). Replacement of window units located in premises common use in an apartment building.

  1. Foundation repair.
  2. Repair of in-house smoke removal system and fire-fighting automatics, repair of fire water supply.
  3. Repair or replacement of a garbage chute located in common areas in an apartment building.
  1. Repair or replacement internal drain.
  2. Development and conduct of examination project documentation, including supervision of the work to preserve cultural heritage sites, identified cultural heritage sites, scientific supervision of the said work in the case of major repairs of common property in apartment buildings in the city of Moscow that are cultural heritage sites, identified cultural sites heritage, implementation of construction control, assessment of compliance of elevators with requirements technical regulations Customs Union“Safety of Elevators” (TR CU 011/2011), approved by the decision of the Customs Union Commission dated October 18, 2011 N 824 “On the adoption of the technical regulations of the Customs Union “Safety of Elevators”.

Major renovations have always been the subject of controversy and questions. Therefore, we decided to talk a little this topic.

About major repairs

The overhaul itself represents complex work on significant changes in the design of the facility. This is a rather complex and costly undertaking, which is carried out exclusively by qualified specialists, since the work performed during the overhaul process ideally ensures not only the aesthetics, but also the safe operation of the building.

What is included in a major overhaul? It could be completely various works, the composition and order of which is determined after analyzing the technical report on the state of engineering systems and building structures, design and estimate documentation and the wishes of the owners.

One of the main areas of major renovation is the repair of walls and facades, which includes the following types works:

· insulation of socles, facades;

· replacement of balcony and window fillings with PVC windows;

· glazing of loggias and balconies;

· repair of socles, facades;

· repair of loggias and balconies with subsequent restoration tile covering, waterproofing, repair of screens, fences;

· repair of fire escapes;

· installation of canopies over loggias, balconies of upper floors, entrances to entrances and basements;

· repair of blind area;

· repair of external walls of elevator shafts;

· repair and replacement of external drainage.

Another area is the repair of basements and house foundations, which includes:

· repair of foundations;

· repair of basement entrances;

· antiseptic treatment of structural elements of the building;

· sealing the intersections of engineering systems with foundations.

In addition, attic and roof repairs can be carried out:

· replacement, repair, fire treatment, antiseptic treatment wooden structures;

· repair or replacement of pallets;

· restoration of temperature and humidity conditions;

· replacement and repair of pallets;

· sealing, repair of air ducts, flues and other similar systems;

· repair, replacement of parapet gratings;

· repair and replacement of internal drainage elements, etc.

During a major overhaul, staircases can also be repaired with the replacement of steps, landing railings, etc. In addition, a significant part of the work in the field of major repairs is devoted to entrance platforms and door fillings. This category includes the following activities:

· replacement and repair of lighting;

repair, replacement entrance doors entrances;

· repair, replacement of doors to garbage chambers;

· repair, strengthening, partial replacement of staircase steps, entrance platform, etc.

In-house engineering systems of an apartment building

Central heating repair:

· replacement and repair of risers, pipelines, connections to heating systems;

· installation heating devices with attached and built-in automatic thermostats;

· replacement or repair of thermal curtains;

· reconstruction of the panel control system;

· adjustment of the heating system;

installation of automatic balancing valves on branches, risers, rings heating systems etc.

Ventilation installation (replacing grilles, cleaning the ventilation system)

Organization of hot and cold water supply:

· replacement and repair of pipelines and heated towel rails, if they belong to common house systems;

· installation shut-off valves;

· replacement of pipe distribution;

· installation of meters, etc.

Of course, the work in the field of major repairs does not end there, and it is very important to understand that to carry them out, only professionals should be involved in the work.

List of works related to major repairs industrial buildings and structures is contained in Appendix No. 8 to the Decree of the USSR State Construction Committee dated December 29, 1973 N 279 “On approval of the Regulations on carrying out scheduled preventative repairs of industrial buildings and structures.”

List of works performed during major repairs housing stock contained in Appendix No. 8 to the Resolution of the State Construction Committee of the Russian Federation dated September 27, 2003 N 170 “On approval of the Rules and Standards for the Technical Operation of the Housing Stock.”

List of works related to major repairs of industrial buildings and structures

According to clause 3.11. Resolution of the USSR State Construction Committee dated December 29, 1973 N 279 “On approval of the Regulations on carrying out scheduled preventative repairs of industrial buildings and structures”, the overhaul of industrial buildings and structures includes such work during which worn structures and parts of buildings and structures are replaced or them to more durable and economical ones, improving the operational capabilities of the objects being repaired, with the exception of a complete change or replacement of the main structures, the service life of which in buildings and structures is the longest (stone and concrete foundations of buildings and structures, all types of building walls, all types of wall frames, pipes of underground networks, bridge supports, etc.).
For a list of major repair work, see Appendix 8.

Appendix 8

SCROLL

OVERHAUL REPAIR OF BUILDINGS AND STRUCTURES

A. BY BUILDINGS

I. Foundations

1. Change wooden chairs or replacing them with stone or concrete pillars.
2. Partial relocation (up to 10%), as well as reinforcement stone foundations and basement walls, not associated with the building’s superstructure or additional loads from newly installed equipment.
3. Restoration of vertical and horizontal insulation of foundations.
4. Restoration of the existing blind area around the building (more than 20% of the total area of ​​the blind area).
5. Repair of existing drains around the building.
6. Replacement of single collapsing stone and concrete pillars.

II. Walls and columns

1. Seal cracks in brick or stone walls with clearing furrows, with bandaging seams with old masonry.
2. Construction and repair of structures that strengthen stone walls.
3. Relaying of dilapidated brick cornices, lintels of pit parapets and protruding parts of walls.
4. Relaying and repair of individual dilapidated sections of stone walls up to 20% of the total volume of masonry, not associated with the superstructure of the building or additional loads from newly installed equipment.
5. Strengthening reinforced concrete and stone columns with clips.
6. Repair and partial replacement (up to 20% of the total volume) of columns, not associated with additional loads from newly installed equipment.
7. Change of fillers in walls with stone, reinforced concrete and metal frames (up to 40%).
8. Replacement of dilapidated crowns of log or cobblestone walls (up to 20% of the total surface of the walls).
9. Continuous caulking of log or cobblestone walls.
10. Partial replacement of sheathing, backfill and slab heaters frame walls(up to 50% of the total wall area).
11. Replacement or repair of cladding and insulation of wooden plinths.
12. Repair of stone plinths of wooden walls with their relocation up to 50% of the total volume.
13. Re-installation and replacement of worn-out clamps of log and cobblestone walls.

III. Partitions

1. Repair, replacement and replacement of worn partitions with more advanced designs of all types of partitions.
2. When carrying out major repairs of partitions, partial redevelopment is allowed with an increase in the total area of ​​the partitions by no more than 20%.

IV. Roofs and coverings

1. Replacement of dilapidated wooden covering trusses or replacing them with prefabricated reinforced concrete ones.
2. Complete or partial replacement of dilapidated metal and reinforced concrete trusses, as well as replacing metal trusses with prefabricated reinforced concrete trusses.
3. Strengthening trusses when changing types of covering (replacing wood slabs with prefabricated reinforced concrete, cold coverings with warm ones, etc.), when suspending lifting devices, as well as in case of corrosion of components and other elements of metal and prefabricated reinforced concrete trusses.
4. Partial or complete replacement of rafters, mauerlats and sheathing.
5. Repair load-bearing structures light lanterns.
6. Repair of devices for opening the covers of skylights.
7. Partial or complete replacement of dilapidated coating elements, as well as their replacement with more progressive and durable ones.
8. Partial (over 10% of the total roof area) or complete replacement or replacement of all types of roofing.
9. Reconstruction of roofs due to replacement of roofing material.
10. Partial or complete replacement of wall gutters, slopes and coverings chimneys and other protruding devices above the roof.

V. Interfloor ceilings and floors

1. Repair or replacement of interfloor ceilings.
2. Replacement of individual structures or floors as a whole with more advanced and durable structures.
3. Strengthening all types of interfloor and attic floors.
4. Partial (more than 10% of the total floor area in the building) or complete replacement of all types of floors and their bases.
5. Rearrangement of floors during repairs with replacement with more durable and durable materials. In this case, the type of floors must comply with the requirements of the standards and technical specifications for new construction.

VI. Windows, doors and gates

1. Complete replacement of dilapidated window and door units, as well as gates of production buildings.

VII. Stairs and porches

1. Partial or complete replacement of staircases, ramps and porches.
2. Change and strengthening of all types of stairs and their individual elements.

VIII. Internal plastering, facing
and painting works

1. Renewal of plastering of all premises and repair of plaster in an amount of more than 10% of the total plastered surface.
2. Change of wall cladding in an amount of more than 10% of the total area of ​​veneered surfaces.
3. Continuous anti-corrosion painting of metal structures.

IX. Facades

1. Repair and renewal of cladding with an area of ​​more than 10% of the cladding surface.
2. Complete or partial (more than 10%) restoration of plaster.
3. Complete restoration of rods, cornices, belts, sandriks, etc.
4. Renewal of molded parts.
5. Continuous painting with stable compounds.
6. Cleaning the facade with sandblasting machines.
7. Change of balcony slabs and fences.
8. Change of coverings of protruding parts of the building.

1. Complete relaying of all types heating stoves, chimneys and their bases.
2. Re-equipment of furnaces to burn coal and gas.
3. Complete refurbishment of kitchen stoves.

XI. Central heating

1. Replacement of individual sections and assemblies of heating boilers, boiler units, or complete replacement of boiler units (if the boiler unit is not an independent inventory item).
2. Repair and replacement of expanders, condensation traps and other network equipment.
3. Repair and re-laying of foundations for boilers.
4. Automation of boiler rooms.
5. Transfer from stove heating to the central one.
6. Changing heating registers.
7. Connecting buildings to heating networks (at a distance from the building to the network of no more than 100 m).

XII. Ventilation

1. Partial or complete replacement of air ducts.
2. Changing fans.
3. Rewinding or changing electric motors.
4. Change of dampers, deflectors, throttle valves, blinds.
5. Partial or complete replacement of ventilation ducts.
6. Change of air heaters.
7. Change of heating units.
8. Changing filters.
9. Change of cyclones.
10. Change of individual chamber designs.

XIII. Water supply and sewerage

1. Partial or complete replacement of the pipeline inside the building, including water supply inlets and sewerage outlets.

XIV. Hot water supply

1. Change of coils and boilers.
2. Change of pipeline, parts and, in general, pumping units, tanks and pipeline insulation.

XV. Electrical lighting and communications

1. Replacement of worn-out sections of the network (more than 10%).
2. Change of safety shields.
3. Repair or restoration of cable channels.
4. When overhauling the network, it is allowed to replace lamps with other types (conventional ones with fluorescent ones).

B. BY STRUCTURES

XVI. Water supply and sewerage facilities

A) Pipelines and network fittings

1. Partial or complete replacement of the anti-corrosion insulation of the pipeline.
2. Change of individual sections of the pipeline (due to pipe wear) without changing the diameter of the pipes. In this case, replacement is allowed cast iron pipes to steel, ceramic to concrete or reinforced concrete and vice versa, but replacement is not allowed asbestos cement pipes to metal (except in emergency cases).
The length of network sections where continuous pipe replacement is allowed should not exceed 200 m per 1 km of network.
3. Replacement of worn-out fittings, valves, fire hydrants, plungers, valves, standpipes or repair them with replacement of worn parts.
4. Replacement of individual siphon pipes.

B) Wells

1. Repair of well cages.
2. Change of hatches.
3. Refilling trays to replace destroyed ones.
4. Replacement of wooden wells that have become unusable.
5. Renewal of plaster.

B) Water intakes and hydraulic structures

1. Dams, dikes, spillways, canals

1. Change or replacement of fastenings of banks or slopes in the amount of up to 50%.
2. Refilling of swollen slopes of earthen structures.
3. Change of robes.
4. Renewal of the protective layer in the underwater parts of reinforced concrete structures.
5. Changing gratings and meshes.
6. Repair and replacement of panel shutters.

2. Water wells

1. Construction and dismantling of a drilling rig or installation and dismantling of an inventory drilling rig.
2. Cleaning the well from collapses and siltation.
3. Removing and installing a new filter.
4. Fastening the well with a new column of casing pipes.
5. Replacement of water-lifting and air pipes.
6. Restoring the well's flow rate by torpedoing or flushing with hydrochloric acid.
7. Cementation of the annulus and drilling of cement.

D) Treatment facilities

1. Repair and replacement of complete waterproofing.
2. Repair and renewal of plaster and ironwork.
3. Translation brick walls and partitions up to 20% of the total volume of masonry in the structure.
4. Sealing leaks in reinforced concrete, concrete and stone walls and bottoms of structures with dismantling the concrete in certain places and re-concreting.
5. Continuous gunite coating of building walls.
6. Repair of drainage around structures.
7. Replacement of tank hatches.
8. Replacing grilles.
9. Replacement of loading filters, biofilters, aerofilters.
10. Changing filter plates.
11. Replacement of pipelines and fittings.
12. Translation drainage system silt sites.

XVII. District heating

A) Channels and cameras

1. Partial or complete change of coatings of channels and chambers.
2. Partial or complete replacement of waterproofing of channels and chambers.
3. Partial re-lining of the walls of brick channels and chambers (up to 20% of the total surface of the walls).
4. Partial relocation of drainage systems.
5. Repair of channel and chamber bottoms.
6. Renewal of the protective layer in reinforced concrete structures channels and cameras.
7. Changing hatches.

B) Pipelines and fittings

1. Partial or complete replacement of the thermal insulation of the pipeline.
2. Renewal of pipeline waterproofing.
3. Replacement of individual sections of the pipeline (due to pipe wear) without increasing the diameter of the pipes.
4. Change of fittings, valves, compensators or repair them with replacement of worn parts.
5. Replacement of movable and fixed supports.

XVIII. Access and in-plant railway tracks

A) Subgrade

1. Widening roadbed in places of insufficient width to normal sizes.
2. Treatment of the subgrade in areas of landslides, erosion, landslides, and abysses.
3. Restoration of all drainage and drainage devices.
4. Restoration of all protective and fortifying structures of the roadbed (turf, paving, retaining walls).
5. Restoration of regulatory structures.
6. Correction, filling of bridge cones.
7. Replacement of individual structures of artificial structures or their replacement with other structures, as well as complete replacement of pipes and small bridges (if they are not independent inventory objects, but are part of the roadbed).

B) Track superstructure

1. Cleaning the ballast layer or updating the ballast with finishing ballast prism up to the dimensions established by the standards for this type of track.
2. Change of unusable sleepers.
3. Replacement of worn rails.
4. Change of unusable fasteners.
5. Straightening curves.
6. Repair of turnouts with replacement of individual elements and transfer bars.
7. Change of turnouts.
8. Repair of the bridge deck.
9. Changing the crossing flooring or replacing wooden with reinforced concrete.

C) Artificial structures (bridges, tunnels, pipes)

1. Partial replacement of elements or complete replacement of worn-out spans.
2. Partial relaying of stone and brick supports (up to 20% of the total volume).
3. Repair concrete supports(up to 15% of the total volume).
4. Shotcrete or cementation of the surface of the supports.
5. Installation of reinforcing reinforced concrete shells (jackets) on supports.
6. Repair or complete replacement of insulation.
7. Change of bridge beams.
8. Change of anti-theft bars.
9. Change of wooden flooring.
10. Replacement of reinforced concrete slab flooring.
11. Changing counter rails.
12. Replacement of damaged elements of wooden bridges, with the exception of piles.
13. Replacement of wooden packages with reinforced concrete spans.
14. Partial re-laying of stone and brickwork vaults and tunnel walls.
15. Pumping cement mortar for lining the tunnel.
16. Repair and replacement of tunnel drainage devices.
17. Relaying the pipe head.
18. Changing elements wooden pipes(up to 50% of wood volume).
19. Change of elements of reinforced concrete or concrete pipes (up to 50% of the volume).

XIX. Car roads

A) Subgrade

1. Treatment of the subgrade in areas of landslides, landslides, washouts and abysses.
2. Restoration of all drainage and drainage systems.
3. Restoration of all protective and fortification structures of the roadbed.
4. Replacement of individual structures of artificial structures or their replacement with other structures, as well as complete replacement of pipes and small bridges (if they are not independent inventory objects, but are part of the roadbed or road as a single inventory object).

B) Road clothing

1. Leveling and replacing individual cement-concrete slabs.
2. Laying a leveling layer of asphalt concrete on the cement-concrete surface.
3. Construction of asphalt concrete pavement on roads with cement-concrete pavement.
4. Change cement-concrete pavement for something new.
5. Strengthening the asphalt concrete pavement.
6. Reconstruction of crushed stone and gravel surfaces.
7. Re-paving.
8. Profiling of dirt roads.

B) Bridges, pipes

1. Partial relaying of stone and brick supports (up to 20% of the total volume).
2. Repair of concrete supports (up to 15% of the total volume).
3. Replacement of damaged elements of wooden bridges, with the exception of piles.
4. Replacement of wooden or reinforced concrete flooring, as well as replacement of wooden flooring with reinforced concrete.
5. Complete change or replacement of spans.
6. Relaying of pipe heads.
7. Change of elements of wooden, reinforced concrete or concrete pipes (up to 50% of the volume).

D) Sites for cars, road construction
and other machines, storage areas, as well as areas
grain collection points

1. Repair and restoration of drainage structures (troughs, ditches, etc.).
2. Re-paving of cobblestone areas.
3. Reconstruction of crushed stone and gravel surfaces of sites.
4. Repair of concrete platforms with laying a leveling layer of concrete.
5. Leveling and replacing individual cement-concrete slabs.
6. Covering with asphalt concrete the areas listed in paragraphs 2 - 5.

XX. Electricity of the net and communication

1. Change or replace unusable fittings.
2. Replacing hooks with traverses.
3. Change of wires.
4. Repair and replacement of end and connecting cable sleeves.
5. Repair or replacement of grounding devices.
6. Change of supports (up to 30% per 1 km).
7. Installation of cable wells.

XXI. Other buildings

1. Repair, replacement or replacement with other supports of overpasses for aerial laying of pipelines.
2. Repair or replacement of platforms, stairs and overpass fences for aerial pipeline installation.
3. Repair or replacement of individual columns (up to 20%) of crane racks.
4. Repair or replacement of crane beams of crane trestles.
5. Repair of galleries and fuel supply racks of boiler houses and gas generator substations with replacement (up to 20%) of structures without changing foundations.
6. Change or complete replacement wooden poles fencing (fences).
7. Repair or replacement of individual concrete and reinforced concrete pillars (up to 20%) and fences (fences).
8. Repair of individual sections of filling between fence posts (up to 40%).
9. Repair of individual sections of solid stone fences (up to 20%).
10. Repair of individual sections of solid adobe fences (up to 40%).
11. Repair of chimneys with replacement or replacement of lining, installation of hoops, restoration of the protective layer of reinforced concrete pipes.
12. Repair and replacement of individual sections of metal chimneys.
13. Repair of ash and slag disposal systems with complete replacement of individual pipeline sections (without increasing the diameter).
14. Repair of loading platforms with a complete change of wooden flooring, blind area or asphalt. Replacement of individual supports or sections of retaining walls (up to 20%). In the event that the unloading area is part of a warehouse facility (ramp), a complete change or replacement of all structures is allowed.

List of works related to major repairs of housing stock

Appendix No. 8 to the Resolution of the State Construction Committee of the Russian Federation dated September 27, 2003 N 170 “On approval of the Rules and Standards for the Technical Operation of the Housing Stock”

SAMPLE LIST
WORK PERFORMED DURING MAIN REPAIRS
HOUSING STOCK

1. Inspection of residential buildings (including a complete inspection of the housing stock) and preparation of design estimates (regardless of the period of repair work).

2. Repair and construction work to replace, restore or replace elements of residential buildings (except for the complete replacement of stone and concrete foundations, load-bearing walls and frames).

3. Modernization of residential buildings during their major repairs (redevelopment taking into account the disaggregation of multi-room apartments; devices additional kitchens and sanitary facilities, expanding living space due to auxiliary premises, improving insolation of residential premises, eliminating dark kitchens and entrances to apartments through kitchens with, if necessary, built-in or attached premises for stairwells, sanitary facilities or kitchens); replacement of stove heating with central heating with the installation of boiler rooms, heat pipelines and heating points; rooftop and other autonomous heat supply sources; refurbishment of furnaces to burn gas or coal; equipment with cold and hot water supply systems, sewerage, gas supply with connection to existing main networks at a distance from the input to the connection point to the main lines up to 150 m, installation of gas ducts, water pumps, boiler rooms; complete replacement of existing central heating systems, hot and cold water supply (including the mandatory use of modernized heating devices and pipelines made of plastic, metal-plastic, etc. and a ban on installation steel pipes); installation of household electric stoves instead gas stoves or kitchen hearths; installation of elevators, garbage chutes, pneumatic waste removal systems in houses with the mark landing top floor 15 m and above; transfer of the existing power supply network to higher voltage; repair television antennas shared use, connection to telephone and radio broadcasting networks; installation of intercoms, electric locks, installation of automatic fire protection and smoke removal systems; automation and dispatching of elevators, heating boiler houses, heating networks, engineering equipment; improvement of courtyard areas (paving, asphalting, landscaping, installation of fences, wood sheds, equipment of children's and utility areas). Repair of roofs, facades, joints of prefabricated buildings up to 50%.

4. Insulation of residential buildings (work to improve heat-shielding properties enclosing structures, installation of window fillings with triple glazing, installation of external vestibules).

5. Replacement of intra-block utility networks.

6. Installation of meters for metering thermal energy consumption for heating and hot water supply, cold and hot water on the building, as well as installation of apartment hot and cold water(when replacing networks).

7. Reconstruction of unventilated combined roofs.

8. Design supervision of design organizations for major repairs of residential buildings with full or partial replacement of floors and redevelopment.

9. Technical supervision in cases where the authorities local government, organizations have created units for technical supervision of major repairs of housing stock.

10. Repair of built-in premises in buildings.

1. List of services and (or) work on major repairs of common property in an apartment building, the provision and (or) implementation of which is financed from the capital repair fund, which is formed on the basis of the minimum contribution for major repairs established by the regulatory legal act subject of the Russian Federation, includes:

1) repair of in-house engineering systems of electrical, heat, gas, water supply, and wastewater disposal;

2) repair, replacement, modernization of elevators, repair of elevator shafts, machine and block rooms;

3) roof repair;

4) repair of basements belonging to common property in an apartment building;

5) facade repair;

6) repair of the foundation of an apartment building.

(see text in the previous edition)

2. A regulatory legal act of a constituent entity of the Russian Federation provides a list of services and (or) work on major repairs of common property in an apartment building, financed from the capital repair fund, the amount of which is based on the minimum amount of contribution for major repairs established by a regulatory legal act of a constituent entity of the Russian Federation Federation, can be supplemented with services and (or) work on facade insulation, conversion of an unventilated roof to a ventilated roof, installation of roof exits, installation of automated information and measurement systems for consumption metering utility resources And utilities, installation of collective (common house) meters for metering the consumption of resources necessary for the provision of public services, and units for managing and regulating the consumption of these resources (heat energy, hot and cold water, electrical energy, gas) and other types of services and (or) works.

(see text in the previous edition)

3. If the owners of premises in an apartment building decide to establish a contribution for capital repairs in an amount exceeding the minimum contribution for capital repairs, part of the capital repair fund formed from this excess, by decision of the general meeting of owners of premises in an apartment building, can be used to finance any services and (or) work on major repairs of common property in an apartment building.

4. The list of services and (or) works for major repairs of common property in an apartment building, which can be financed from state support provided by a constituent entity of the Russian Federation, is determined by a regulatory legal act of a constituent entity of the Russian Federation.

5. Work on major repairs of common property in an apartment building may include work on the replacement and (or) restoration of load-bearing building structures of an apartment building and (or) utility networks of an apartment building, classified in accordance with the legislation on urban planning activities as reconstruction of capital construction projects .