State elemental estimate standards. State elemental estimate standards for construction work

Scope of work: 01. Cutting and installing boards (standard 1). 02. Installation of formwork panels (standard 1). 03. Fastening formwork elements with construction nails (standard 1). 04. Installation and welding of fittings. 05. Styling concrete mixture. Meter: 100 m 3 reinforced concrete in action

Belt arrangement:

06-01-035-1 in formwork

06-01-035-2 without formwork

Resource code Cost element name Unit measured 06-01-035-1 06-01-035-2
2
Labor costs of construction workers person-hour 1016,26 516,46
Average job level - 3,4 3,4
Driver labor costs person-hour 72,31 61,50
Machines and mechanisms
Tower cranes when working on other types of construction (except installation technological equipment) 8 t mach.-h 69,97 59,44
Truck-mounted cranes when working on other types of construction (except main pipelines) 10 t mach.-h 0,84 0,72
Forklifts 5 t mach.-h 0,27 0,27
Installations for manual arc welding ( direct current) mach.-h 208,25 208,25
Deep vibrators mach.-h 49,09 24,75
Flatbed vehicles with a carrying capacity of up to 5 tons mach.-h 1,23 1,07
Materials
401-9021 Concrete (design class) m 3 101,5 101,5
204-9001 Armature T 12,5 12,5
203-0511 Boards made of boards 25 mm thick m 2 77,9 -
102-0061 Softwood lumber. Edged boards 4 -6.5 m long, 75-150 mm wide, 44 mm thick or more, grade III m 3 0,81 -

End of table. 3.1

Elemental estimate standards serve as the basis for drawing up unit prices(EP), determining the amount of direct costs for performing a unit of work or structural elements:

EP = ZP + EM + M, (3.4)

where ZP is the cost of paying workers when performing a unit of work, rubles; EM - costs of operating machines when performing a unit of work, rub.; M - estimated cost material resources per unit of work, rub.

Labor costs for workers when performing a unit of work are determined by the formula:

where is the rate of labor costs for construction workers to complete a unit of work, person-hour; - monthly tariff rate for a 1st category worker when working in normal conditions labor provided for in industry tariff agreements, rub.; tariff coefficient of the corresponding category of work, accepted according to the current tariff schedule; - regional coefficient of wages established by the decision-making body; - a coefficient that takes into account incentive payments according to systemic provisions: bonuses for production results according to piece-rate and time-based bonus systems of remuneration, for commissioning of facilities, remuneration based on the results of work for the year; bonuses to tariff rates and salaries for professional excellence and high achievements in work; one-time rewards for length of service; - coefficients taking into account compensatory payments related to working hours and working conditions: additional payments to tariff rates and salaries for night work, overtime work, multi-shift work, for combining professions, expanding service areas, for work in difficult, hazardous conditions , especially hazardous working conditions, additional payments for mobile and traveling character work, shift allowances, etc.; PV - other payments, including those provided for by law Russian Federation for unworked time: payment for regular and additional holidays, preferential hours for teenagers, breaks from mothers’ work to feed the child, payment for time associated with medical examinations, performing government duties, etc.; - the estimated number of hours of work per worker per month.

Labor costs can be determined more simple method based on statistical data according to the formula

(3.6)

where is the actual at the time of calculation or projected average monthly salary of one worker in construction organizations, rub.

Operating costs construction machines when performing units of work are determined by the formula

(3.7)

where is the standard operating time j th machine when performing a unit of work, machine-hour; j(1,2,..., T) - types of cars; - estimated price for the operation of construction machines, r./machine-hours.



The estimated cost of material resources per unit of work is determined by the formula

(3.8)

where is the consumption rate i-th material to complete a unit of work in established units of measurement; i(1,2,..., n) - types of materials; - estimated cost ex-offsite warehouse unit of measurement i-th material, p.

Single releases are the main standards for drawing up estimates for types of construction and installation work. In this case, territorial (for mass industrial and civil construction) or sectoral (for special types construction or work) collections of unit prices.

Since 2002, collections of unit prices have been put into effect, developed on the basis of GESN 2001 in prices as of 01/01/2000. Prices for material resources and prices for the operation of machines were adopted according to newly developed corresponding collections of estimated prices. Workers' wages are determined according to statistical reporting with an average category of 4.3 according to the six-category tariff scale of 1987.

Unit prices can be closed, in which all costs associated with the execution of work are taken into account, and open, in which the cost of basic materials and prefabricated products and structures is subject to additional accounting in the estimate based on design data. An example of a unit price is given in table. 3.2.

In the absence of unit prices for 2001, for some types of construction or work, prices compiled in basic prices, but EPEP 84 or SNiR-91, with appropriate indexation, can be used.

Unlike direct costs overhead rates are normalized indirectly as a percentage of the selected calculation base.

At the base price level (1984 and 1991), overhead rates were set at: construction works- as a percentage of direct costs (average for ministries and departments and uniform limits for some types of special work, including installation metal structures, internal plumbing work); on installation work as a percentage of the basic wages of workers (unified limits for types of work).

Table GESN 06-01-036 Device for backfilling foundation beams

Scope of work:

01.Filling the foundation beams with sand (standard 1). 02.Filling the foundation beams with slag (standard 2).

Meter: 100 m 3 backfill

Device for backfilling foundation beams:

Resource code

Unit measured

06-01-036-1

06-01-036-2

1

person-hour

196,47

196,47

Average job level

2

Driver labor costs

person-hour

38,20

34,15

3

MACHINES AND MECHANISMS

070148

Bulldozers when working on other types of construction (except water) 59 (80) kW (hp)

mach.-h

16,28

11,03

331101

Pneumatic rammers

mach.-h

18,56

18,56

030101

Forklifts 5 t

mach.-h

12,64

13,84

050102

Mobile compressors with internal combustion engine pressure up to 686 kPa (7 at) 5 m 3 /min

mach.-h

9,28

9,28

4

MATERIALS

408-9040

Natural sand for construction work

m 3

409-9056

Slag sand fraction - medium

m 3

Table GESN 06-01-037 Arrangement of crossbars civil buildings in metal formwork

Scope of work:

01.Cutting and installing edged boards. 02. Fastening wooden formwork elements with construction nails and wire. 03.Installation of fittings. 04.Installation metal formwork. 05.Laying concrete mixture.

Resource code

Name of cost elements

Unit measured

06-01-037-1

1

Labor costs of construction workers

person-hour

1491,07

Average job level

2

Driver labor costs

person-hour

464,77

3

MACHINES AND MECHANISMS

020129

mach.-h

459,34

021141

mach.-h

2,17

111100

Deep vibrators

mach.-h

74,02

400001

mach.-h

3,26

4

MATERIALS

101-0584

Anthracene oils

0,158

101-0816

0,03

102-0056

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 32-40 mm thick, grade II

m 3

204-9001

Armature

401-9022

Heavy concrete (design class)

m 3

101,5

101-1805

Construction nails

0,062

101-9866

Metal formwork (depreciation)

set

08 COLORS

Table GESN 06-01-041 Construction of floors

Scope of work:

01.Cutting and installation of beams, bars and boards. 02.Installation of formwork panels. 03. Fastening formwork elements with wire and construction nails. 04. Installation and welding of fittings. 05.Laying concrete mixture.

Meter: 100 m 3 in use

Installation of beamless floors with thickness:

Installation of ribbed floors at a height from the supporting area:

Construction of floors on steel beams and monolithic sections with prefabricated reinforced concrete floors with an area of ​​up to 5 m 2 given thickness:

06-01-041-7

up to 100 mm

06-01-041-8

up to 150 mm

06-01-041-9

up to 200 mm

Construction of floors on steel beams and monolithic sections with prefabricated reinforced concrete floors with an area of ​​more than 5 m2 of reduced thickness:

Resource code

Name of cost elements

Unit measured

06-01-041-1

06-01-041-2

06-01-041-3

06-01-041-4

06-01-041-5

1

Labor costs of construction workers

person-hour

951,08

1840,80

678,50

1180,00

1534,00

Average job level

2

Driver labor costs

person-hour

31,17

31,17

25,59

25,48

42,12

3

MACHINES AND MECHANISMS

020129

Tower cranes when working on other types of construction (except installation of technological equipment) 8 t

mach.-h

28,56

28,56

23,59

23,55

38,79

021141

Truck-mounted cranes when working on other types of construction (except main pipelines) 10 t

mach.-h

0,94

0,94

0,69

0,66

1,22

030101

Forklifts 5 t

mach.-h

0,27

0,27

0,27

0,27

0,27

111301

Surface vibrators

mach.-h

47,96

92,82

34,27

59,50

77,35

400001

Flatbed vehicles with a carrying capacity of up to 5 tons

mach.-h

1,40

1,40

1,04

1,00

1,84

331532

Electric chain saws

mach.-h

4,60

4,60

2,90

2,90

4,70

040502

mach.-h

216,58

4

MATERIALS

102-0025

m 3

6,22

6,22

102-0032

m 3

0,99

0,99

0,65

102-0053

m 3

0,53

0,53

0,32

0,31

0,88

102-0061

m 3

2,61

2,75

1,64

3,39

201-9002

Steel structures

0,24

0,28

0,64

204-9001

Armature

7,66

7,66

6,63

6,63

12,69

401-9021

Concrete (design class)

m 3

101,5

101,5

101,5

101,5

101,5

203-0511

m 2

86,1

86,1

52,6

50,6

144,2

101-0816

Light wire with a diameter of 1.1 mm

0,0116

0,0116

0,0063

0,0063

101-1805

Construction nails

0,079

0,079

0,071

0,071

0,116

101-0253

0,086

0,086

0,043

0,043

0,069

411-0001

Water

m 3

0,257

0,257

0,128

0,128

0,206

101-1782

Bag fabric

10 m2

4,29

4,29

2,15

2,15

4,29

203-0518

PC.

101-1513

0,26

101-0797

0,037

Resource code

Name of cost elements

Unit measured

06-01-041-6

06-01-041-7

06-01-041-8

06-01-041-9

06-01-041-10

1

Labor costs of construction workers

person-hour

2124,00

1675,60

1368,80

968,78

1227,20

Average job level

2

Driver labor costs

person-hour

42,12

47,25

44,16

41,73

47,23

3

MACHINES AND MECHANISMS

020129

Tower cranes when working on other types of construction (except installation of technological equipment) 8 t

mach.-h

38,79

44,27

41,53

39,03

43,91

021141

Truck-mounted cranes when working on other types of construction (except main pipelines) 10 t

mach.-h

1,22

1,09

1,00

1,14

1,31

030101

Forklifts 5 t

mach.-h

0,27

0,27

0,27

0,27

0,27

040502

Installations for manual arc welding (DC)

mach.-h

216,58

199,92

149,94

99,96

199,92

111301

Surface vibrators

mach.-h

107,10

84,49

69,02

48,79

61,88

400001

Flatbed vehicles with a carrying capacity of up to 5 tons

mach.-h

1,84

1,62

1,36

1,29

1,74

331532

Electric chain saws

mach.-h

4,70

3,80

2,85

1,90

1,75

4

MATERIALS

101-1513

Electrodes with a diameter of 4 mm E42

0,26

0,24

0,18

0,12

0,24

102-0025

Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III

m 3

102-0032

Softwood lumber. Edged beams 4-6.5 m long, 75-150 mm wide, 150 mm thick or more, grade II

m 3

0,65

102-0053

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III

m 3

0,88

1,91

1,44

0,96

102-0061

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 44 mm thick or more, grade III

m 3

3,53

4,48

3,36

2,24

3,37

201-9002

Steel structures

0,74

204-9001

Armature

12,69

11,9

8,91

5,94

10,9

401-9021

Concrete (design class)

m 3

101,5

101,5

101,5

101,5

101,5

203-0511

Boards made of boards 25 mm thick

m 2

144,2

152,8

114,6

76,4

101-1805

Construction nails

0,116

0,048

0,032

0,024

0,048

101-0253

Construction quicklime lump, grade 1

0,069

0,076

0,057

0,038

0,09

411-0001

Water

m 3

0,206

0,214

0,16

0,11

0,252

101-1782

Bag fabric

10 m2

4,29

101-0797

Hot rolled wire rod in coils with a diameter of 6.3-6.5 mm

0,037

0,133

203-0518

Wood-metal sliding inventory racks

PC.

Resource code

Name of cost elements

Unit measured

06-01-041-11

06-01-041-12

06-01-041-13

1

Labor costs of construction workers

person-hour

993,56

758,74

960,52

Average job level

2

Driver labor costs

person-hour

44,56

41,11

42,13

3

MACHINES AND MECHANISMS

020129

Tower cranes when working on other types of construction (except installation of technological equipment) 8 t

mach.-h

41,41

38,68

39,15

021141

Truck-mounted cranes when working on other types of construction (except main pipelines) 10 t

mach.-h

1,25

0,94

1,18

030101

Forklifts 5 t

mach.-h

0,27

0,27

0,27

040502

Installations for manual arc welding (DC)

mach.-h

149,94

99,96

111301

Surface vibrators

mach.-h

50,10

38,32

48,43

400001

Flatbed vehicles with a carrying capacity of up to 5 tons

mach.-h

1,63

1,22

1,53

331532

Electric chain saws

mach.-h

1,52

1,51

2,12

4

MATERIALS

101-1513

Electrodes with a diameter of 4 mm E42

0,18

0,12

102-0053

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III

m 3

0,85

0,66

102-0061

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 44 mm thick or more, grade III

m 3

1,83

3,02

204-9001

Armature

8,17

5,44

7,96

401-9021

Concrete (design class)

m 3

101,5

101,5

101,5

203-0511

Boards made of boards 25 mm thick

m 2

138,6

97,4

121,4

101-0797

Hot rolled wire rod in coils with a diameter of 6.3-6.5 mm

0,133

0,0118

101-1805

Construction nails

0,032

0,024

0,038

101-0253

Construction quicklime lump, grade 1

0,069

0,049

0,061

411-0001

Water

m 3

0,194

0,136

0,17

09 STRUCTURES FROM BARYTE CONCRETE

Table GESN 06-01-044 Construction of barite concrete partitions and an insulating layer of barite concrete

Scope of work:

01.Cutting and installing bars and boards. 02.Installation of formwork panels. 03. Fastening formwork elements with construction bolts and nails. 04. Placement in a container and mixing of cement, barite sand and gravel. 05. Mixing the barite concrete mixture with water with stirring. 06.Laying the finished barite concrete mixture into the structure.

Meter: 100 m 3 of barite concrete in action

Construction of barite concrete partitions with height:

Resource code

Name of cost elements

Unit measured

06-01-044-1

06-01-044-2

06-01-044-3

1

Labor costs of construction workers

person-hour

1218,00

1508,00

747,04

Average job level

2

Driver labor costs

person-hour

99,44

100,01

97,35

3

MACHINES AND MECHANISMS

020129

Tower cranes when working on other types of construction (except installation of technological equipment) 8 t

mach.-h

44,03

44,51

42,96

021141

Truck-mounted cranes when working on other types of construction (except main pipelines) 10 t

mach.-h

2,29

2,33

1,92

030101

Forklifts 5 t

mach.-h

11,88

11,88

11,77

110811

Mobile forced-action concrete mixers 250 l

mach.-h

37,82

37,82

37,82

111301

Surface vibrators

mach.-h

62,48

77,35

38,32

400001

Flatbed vehicles with a carrying capacity of up to 5 tons

mach.-h

3,42

3,47

2,88

331532

Electric chain saws

mach.-h

6,27

3,56

4

MATERIALS

101-1305

Portland cement for general construction purposes additive-free brands 400

32,4

32,4

32,3

102-0025

Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III

m 3

0,32

0,32

102-0053

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III

m 3

102-0061

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 44 mm thick or more, grade III

m 3

4,13

4,81

408-9030

Barite sand

m 3

33,3

33,3

32,6

408-9281

Gravel for construction work

m 3

101-1714

Construction bolts with nuts and washers

0,21

0,21

203-0511

Boards made of boards 25 mm thick

m 2

101-1805

Construction nails

0,16

0,128

101-0253

Construction quicklime lump, grade 1

0,088

0,088

411-0001

Water

m 3

0,246

0,246

10 TUNNELS AND PASSAGE CHANNELS

Table GESN 06-01-046 Construction of walls, bottoms and ceilings of tunnels and passage channels

Scope of work:

01. Arrangement and dismantling of scaffolding supporting the floor formwork. 02.Installation and dismantling of formwork. 03. Installation and welding of fittings. 04.Laying concrete. 05.Concrete care. 06. Arrangement of expansion joints.

Meter: 100 m 3 reinforced concrete in action

Construction of walls, bottoms and ceilings of tunnels and passage channels with a height to width ratio:

Construction of walls and bottoms of tunnels and passage channels with a height to width ratio:

Resource code

Name of cost elements

Unit measured

06-01-046-1

06-01-046-2

06-01-046-3

06-01-046-4

06-01-046-5

1

Labor costs of construction workers

person-hour

572,00

493,00

453,00

827,00

647,00

Average job level

2

Driver labor costs

person-hour

75,02

54,74

53,62

59,40

53,86

3

MACHINES AND MECHANISMS

021243

Cranes on crawler tracks when working on other types of construction (except main pipelines) up to 16 tons

mach.-h

70,56

50,40

49,28

54,88

48,16

111100

Deep vibrators

mach.-h

44,80

38,08

38,08

53,76

42,56

021141

Truck-mounted cranes when working on other types of construction (except main pipelines) 10 t

mach.-h

2,02

1,96

1,96

1,81

2,28

040502

Installations for manual arc welding (DC)

mach.-h

180,32

148,96

141,12

219,52

188,16

400001

Flatbed vehicles with a carrying capacity of up to 5 tons

mach.-h

2,44

2,38

2,38

2,71

3,42

4

MATERIALS

101-1513

Electrodes with a diameter of 4 mm E42

0,23

0,19

0,18

0,28

0,24

102-0049

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 19-22 mm thick, grade III

m 3

0,17

0,13

0,11

0,06

0,05

102-0053

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III

m 3

0,07

0,06

0,05

0,06

0,05

102-0061

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 44 mm thick or more, grade III

m 3

0,15

0,13

0,11

0,18

0,14

204-9001

Armature

T

11,8

9,34

9,3

14,01

19,95

401-9021

Concrete (design class)

m 3

101,5

101,5

101,5

101,5

101,5

401-0004

Heavy concrete, class B 10 (M100)

m 3

0,58

0,47

0,38

0,36

0,28

203-0511

Boards made of boards 25 mm thick

m 2

11,3

9,6

7,94

9,55

7,4

101-1805

Construction nails

T

0,068

0,041

0,041

0,063

0,04

101-0253

Construction quicklime lump, grade 1

T

0,052

0,035

0,035

0,049 part 2 part 3 part 4 part 5 part 6 part 7

  • part 8
  • FOR CONSTRUCTION WORK

    GESN-2001-06

    Collection No. 6

    CONCRETE AND REINFORCED CONCRETE STRUCTURES, MONOLITHIC

    These State Elementary Estimate Standards (GESN) are intended to determine the need for resources (labor costs of workers, construction machines, materials) when performing work on the construction of structures made of bricks and blocks and to draw up estimates (estimates) using the resource method.

    GESN-2001 are the initial standards for the development of State unit prices for construction work at the federal (FER), territorial (TER) industry levels, individual and integrated standards (prices) and other regulatory documents used to determine direct costs in the estimated cost of construction work.

    DEVELOPED Interregional Center for Pricing in Construction and the Building Materials Industry (ICTS) of the Gosstroy of Russia (I.I. Dmitrenko, L.N. Krylov,), 31 GPI SS MO RF, Moscow (V.G. Guryev, A.N. Zhukov, A.L. Kostyuk) and the St. Petersburg Regional Center for Pricing in Construction LLC RCES (P.V. Goryachkin, E.E. Dyachkov, L.A. Danilova) with the participation of specialists - V.G. Usachev (JSC "RASA Co", Moscow), A.P. Ivanov (JSC Construction Corporation of St. Petersburg), A.A. Kozlovskaya, S.M. Weller (JSC LenNIIproekt Institute, St. Petersburg), Ph.D. I.Yu. Nosenko, (JSC "INiK").

    CONSIDERED Department of Pricing and Estimated Standardization in Construction and Housing and Communal Services of the Gosstroy of Russia (Editing Committee: V.A. Stepanov-Head, V.N. Maklakov, G.A. Shanin, T.L. Grishchenkova).

    INTRODUCED Department of Pricing and Estimated Standardization in Construction and Housing and Communal Services of the Gosstroy of Russia

    APPROVED AND PUT INTO EFFECT from May 1, 2000 by Decree of the State Construction Committee of Russia dated April 26, 2000 No. 36.

    INTRODUCEDCHANGES AND ADDITIONS, approved and put into effect on October 20, 2002 by Decree of the Gosstroy of Russia dated October 15, 2002 No. 127 and approved and put into effect on March 9, 2004 by Decree of the Gosstroy of Russia dated March 9, 2004 No. 41

    Technical part

    1. General instructions

    1.1. These State Elementary Estimate Standards (GESN) are intended to determine the need for resources (labor costs of workers, construction machines, materials) when performing work on the construction of monolithic concrete and reinforced concrete structures in industrial and civil construction and drawing up estimates (estimates) using the resource method . GESN are the initial standards for the development of unit prices, individual and consolidated standards (prices).

    1.2. GESN reflect the industry average costs for the operation of construction machinery and mechanisms, technology and organization by type of construction work. GESN are mandatory for use by all enterprises and organizations, regardless of their affiliation and forms of ownership, carrying out capital construction with the involvement of funds from the state budget of all levels and targeted extra-budgetary funds.

    For construction projects financed from the own funds of enterprises, organizations and individuals, GESN are advisory in nature.

    In cases where design solutions provide for more stringent requirements for the accuracy of monolithic concrete and reinforced concrete structures than those provided for in clause 3.7 and table. 12 SNiP 3.03.01-87 "Load-bearing and enclosing structures", it is necessary to develop individual estimate standards, or individual increasing coefficients to the standards of the tables of the GESN-2001 Collection "Concrete and reinforced concrete structures monolithic", taking into account all the complicating factors associated with increased requirements for the construction of monolithic concrete and reinforced concrete structures.

    1.3. The standards take into account the costs of performing a full range of work, including:

    Unloading;

    Transportation of materials and products from the on-site warehouse to the place of laying or installation;

    Installation and dismantling of scaffolding;

    Installation, lubrication and dismantling of formwork, taking into account its turnover;

    Control assembly, installation and dismantling of sliding formwork with scaffolds and working platforms, installation and dismantling of equipment, instruments, auxiliary structures, electrical wiring, jacking frames and jacks, installation and extension of jacking rods, installation and dismantling of shaft ladders or lifts for lifting people;

    Installation of reinforcement for reinforced concrete structures with welding or knitting and straightening of reinforcement, installation and disassembly of inventory forms or brackets when welding using the bath method;

    Laying the concrete mixture with compaction, maintaining the concrete and partially grouting the exposed surfaces after removing the formwork (if necessary);

    Installation of temporary shrink workers and expansion joints(if necessary);

    Separate tables of standards for structures that differ in the scope of work contain a list of additional operations.

    1.4. The standards in the tables show the average consumption of reinforcement based on the technology (frames, meshes, individual rods).

    When drawing up estimates, the consumption of reinforcement and the class of steel should be taken according to design data without adjusting the cost of labor and machinery for its installation.

    1.5. The standards take into account the costs of installing fittings using electric welding or knitting, with the exception of standards 5, 6 of Table 01002, which take into account pool welding.

    If it is necessary to use bath welding of reinforcement (instead of electric welding or knitting), additional standards given in Table 01016 should be taken into account.

    1.6. Concrete classes and aggregate size should be taken according to design data. In the absence of the specified data, concrete classes and aggregate size should be taken according to the following table.

    Table 1

    Constructions

    Class (brand) of concrete

    Size

    filler, mm

    1. Concrete and rubble concrete structures

    from 40 to 70

    2. Preparation for foundations

    3. Foundations, foundation slabs, footings, equipment foundations, retaining walls and walls more than 200 mm thick

    from 40 to 70

    4. Bunkers, tank structures, cooling towers and walls erected in sliding formwork

    V 22.5 (M300)

    5. Other not listed designs

    1.7. The costs of installing metal structures and steel cores used as rigid reinforcement should be determined according to the relevant standards of the collection GESN-2001-09 "Metal Structures".

    1.8. The standards take into account the construction of structures at a height (depth) of up to 15 m from the surface of the earth (with the exception of structures of special structures). When determining the costs of work at elevations above (below) 15 m from the surface of the earth, labor costs should be adjusted by the coefficients given in Section 3 of the technical part.

    1.9. The costs of constructing foundations for metal columns should be determined according to the standards of Table 212. 01001 with installation costs added anchor bolts and conductor devices remaining in the concrete body according to standards 1-10 of Table. 01014. The consumption of concrete (mortar) for filling nests (wells) when installing anchor bolts is taken into account in the standards for foundation construction.

    1.10. Costs for constructing foundations for columns for thickeners of concentrating and sintering plants, specified in standards 1-3 of Table. 01008 should be determined according to standards 2-9 of tables. 01001.

    1.11. The costs of constructing foundations with pillars with a perimeter of more than 10 m should be determined according to standards 2-9 of Tables. 01001, and with a perimeter of up to 10 m and a height of more than 10 m (counting from the upper ledge) should be calculated separately: for foundations (up to the upper ledge) according to standards 8-9 of Table. 01001, and for column supports according to the norm of 12 tables. 01001.

    1.12. The costs of installing a slab with pillars with a height of more than 2 m should be determined separately: for a slab according to the norm of 16 tables. 01001, and column sills: with a perimeter of up to 10 m - according to the norm of 12 tables. 01001, and more than 10 m - according to standards 5-9 of Table. 01001.

    1.13. The costs of installing grillages should be determined according to the relevant standards in Table. 01001 and 01005 for the construction of similar foundations, for example, grillages on single piles or clusters of piles for individual columns - according to the standards for foundations of the corresponding volume for columns, grillages in the form of slabs along a pile field according to the standards for foundation slabs, grillages in the form of tapes according to rows of piles according to the standards for strip foundations, etc.

    When determining the costs of installing grillages in which the lower surface rises above the ground (such as grillages in permafrost soils to form a ventilated underground), you should additionally take into account the costs of installing the formwork from below and its supporting structures according to Table. 01012.

    1.14. The costs of installing anchor bolts and embedded products for fastening equipment should be determined in accordance with the guidelines for the application of equipment installation standards.

    1.15. The costs of installing columns for thickeners should be determined according to standards 1-6 of Tables. 01026.

    1.16. The costs of constructing two-tier thickeners should be determined according to the standards of Tables 1-4. 01008.

    1.17. Additional costs for constructing foundations for equipment of various configurations with the installation of channels, niches, wells, sockets for anchor bolts, protruding elements, etc. in their thickness. should be determined according to standards 7, 8 of table. 01005.

    1.18. The costs of constructing foundations consisting of columns, beams, and other elements should be determined according to the relevant standards for individual structural elements.

    1.19. The consumption rates for wooden formwork and fastening parts are determined taking into account the normal number of their revolutions and the norms of permissible losses after each revolution.







    LOCAL RESOURCE STATEMENT GESN 06-01-001-05

    PRICE VALUES

    The quotation contains only the direct costs of work for the period 2000(prices in Moscow and the Moscow region), which are calculated according to standards 2009. To draw up an estimate, you need to apply the conversion index to the prices of the current year to the cost of the work.

    You can go to the pricing page, which is calculated based on the 2014 edition standards with additions 1
    To determine the composition and consumption of materials, machines and labor costs, GESN-2001 was used

    LABOR COSTS

    Name Unit Change Labor costs
    1 Labor costs of construction workers Level 3 person-hour 785,88
    2 Labor costs for drivers (for reference, included in the price of the EV) person-hour 31,3
    Total labor costs for workers person-hour 785,88
    Workers' compensation = 785.88 x 8.53 Rub. 6 703,56
    Payroll for drivers = 433.11 (for calculating invoices and profits) Rub. 433,11

    Standards and prices of GESN in the form of the DefSmeta program


    OPERATION OF MACHINES AND MECHANISMS

    Cipher Name Unit Change Consumption Article number
    Rub.
    Total
    Rub.
    1 020129 Tower cranes when working on other types of construction 8 t mach.-h 30,35 86,4 2 622,24
    2 021141 Truck-mounted cranes when working on other types of construction 10 t mach.-h 0,68 111,99 76,15
    3 030101 Forklifts 5 t mach.-h 0,27 89,99 24,30
    4 111100 Deep vibrator mach.-h 37,72 1,9 71,67
    5 331532 Electric chain saw mach.-h 0,87 3,27 2,84
    6 400001 Flatbed vehicles, load capacity up to 5 tons mach.-h 0,99 87,17 86,30
    Total Rub. 2 883,50

    CONSUMPTION OF MATERIALS

    Cipher Name Unit Change Consumption Article number
    Rub.
    Total
    Rub.
    1 101-0797 Hot rolled wire in coils, diameter 6.3-6.5 mm T 0,0375 4455,2 167,07
    2 101-0816 Light wire with a diameter of 1.1 mm T 0,0061 10200 62,22
    3 101-1668 Mat m2 153 10,2 1 560,60
    4 101-1805 Construction nails T 0,0238 11978 285,08
    5 102-0061 Edged softwood boards 4-6.5 m long, 75-150 mm wide, 44 mm thick or more, grade III m3 0,74 1056 781,44
    6 203-0511 Boards made of boards 25 mm thick m2 64,1 35,53 2 277,47
    7 204-9001 Armature T 4,5 0 0,00
    8 401-9021 Concrete m3 101,5 0 0,00
    9 405-0253 Construction quicklime lump, grade I T 0,027 734,5 19,83
    10 411-0001 Water m3 0,441 2,44 1,08
    Total Rub. 5 154,79

    TOTAL BY RESOURCES: 8,038.29 RUB.







    LOCAL RESOURCE STATEMENT GESN 06-01-041-01

    Name Unit
    Installation of beamless floors with a thickness of up to 200 mm at a height of up to 6 m from the supporting area 100 m3 in use
    Scope of work
    01. Cutting and installation of beams, beams and boards 02. Installation of formwork panels 03. Fastening of formwork elements with wire and construction nails 04. Installation and welding of reinforcement 05. Laying concrete mixture

    PRICE VALUES

    The price takes into account the work requirements for year 2000(Moscow prices), calculated according to the GESN sample 2009. Indexation of translation into current prices must be applied to the cost.

    You can go to the pricing page, which is calculated based on the 2014 edition standards with additions 1
    To determine the composition and consumption of materials, machines and labor costs, GESN-2001 was used

    LABOR COSTS

    Name Unit Change Labor costs
    1 Labor costs of construction workers Grade 3.1 person-hour 951,08
    2 Labor costs for drivers (for reference, included in the price of the EV) person-hour 29,77
    Total labor costs for workers person-hour 951,08
    Workers' compensation = 951.08 x 8.62 Rub. 8 198,31
    Payroll for drivers = 417.21 (for calculating invoices and profits) Rub. 417,21

    Organization of supplies for a construction site


    OPERATION OF MACHINES AND MECHANISMS

    Cipher Name Unit Change Consumption Article number
    Rub.
    Total
    Rub.
    1 020129 Tower cranes when working on other types of construction 8 t mach.-h 28,56 86,4 2 467,58
    2 021141 Truck-mounted cranes when working on other types of construction 10 t mach.-h 0,94 111,99 105,27
    3 030101 Forklifts 5 t mach.-h 0,27 89,99 24,30
    4 111301 Surface vibrator mach.-h 47,96 0,5 23,98
    5 331532 Electric chain saw mach.-h 4,6 3,27 15,04
    6 400001 Flatbed vehicles, load capacity up to 5 tons mach.-h 1,4 87,17 122,04
    Total Rub. 2 758,21

    CONSUMPTION OF MATERIALS

    Cipher Name Unit Change Consumption Article number
    Rub.
    Total
    Rub.
    1 101-0816 Light wire with a diameter of 1.1 mm T 0,0116 10200 118,32
    2 101-1782 Bag fabric 10 m2 4,29 84,75 363,58
    3 101-1805 Construction nails T 0,079 11978 946,26
    4 101-2598 Wood-metal sliding inventory racks PC. 2,8 1010 2 828,00
    5 102-0025 Edged softwood bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III m3 6,22 1287 8 005,14
    6 102-0032 Edged softwood bars 4-6.5 m long, 75-150 mm wide, 150 mm thick or more, grade II m3 0,99 2156 2 134,44
    7 102-0053 Edged softwood boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III m3 0,53 1100 583,00
    8 102-0061 Edged softwood boards 4-6.5 m long, 75-150 mm wide, 44 mm thick or more, grade III m3 2,61 1056 2 756,16
    9 201-9002 Steel structures T 0,5 0 0,00
    10 203-0511 Boards made of boards 25 mm thick m2 86,1 35,53 3 059,13
    11 204-9001 Armature T 7,66 0 0,00
    12 401-9021 Concrete m3 101,5 0 0,00
    13 405-0253 Construction quicklime lump, grade I T 0,086 734,5 63,17
    14 411-0001 Water m3 0,257 2,44 0,63
    Total Rub. 20 857,83

    TOTAL BY RESOURCES: 23,616.04 RUB.