Compound:

Cement binder, fractionated sand, mineral fillers, modifying polymer additives.

  • Application characteristics
  • Consumption of dry mixture per 1 sq. m with a layer of 10 mm 18-20 kg
  • Minimum layer thickness 5 mm
  • Maximum thickness layer 50 mm
  • Maximum layer thickness for partial leveling 60 mm
  • Storability of the finished solution in an open container At least 1 hour
  • 48 hours
  • Laying floor coverings(depending on the type of coating) from 5 days
  • Time to fully gain strength 28 days
  • Carrying out work at base temperature from +5 to +25 °С
  • Operation characteristics
  • Brand strength M 150
  • Compressive strength (after 28 days) Not less than 15 MPa
  • Flexural strength (after 28 days) Not less than 2.5 MPa

Instructions

  • Preparation for work
  • Base requirements
  • Preparation of the solution
  • Operating procedure
  • Surface care
  • Storage
  • Safety precautions

Before starting work, make sure that the window and doorways closed, there are no drafts in the room, the air temperature is in the range from +5 to +25 ° C and such temperature regime kept indoors for at least 5 days before starting work and three days after application.

  1. The base must comply with the requirements of SP 29.13330.2011; when carrying out work on the “Warm Floor” system, it is recommended to turn off the heating at least 2 days before the start of work.
  2. The surface of the base must be cleaned of dirt and dust, paint coatings and glue, peeling old coatings and oil stains - everything that can impair the adhesion of the material to the base.
  3. Weak areas of the base, protrusions and irregularities must be removed by grinding or milling.
  4. All cracks, deep potholes in the base, joints of slabs must be opened a day before the start of floor leveling work, cleaned of dust, treated with Bergauf TIEFGRUNT primer and filled with a thickly diluted Bergauf Base mixture.
  5. The prepared base must be treated with Bergauf TIEFGRUNT primer
  6. Dry and highly absorbent substrates must be primed twice. Allow the first coat of primer to dry for 1 hour before reapplying. Floor installation work should be carried out no earlier than 4 hours.

If the base surface is not primed, cracks may occur during the hardening period of the floor and a decrease in the strength of the hardened mortar .

Use clean containers and tools to prepare the solution.

  1. Mix the mixture with water (from +5 to +25 °C) in the following proportion:

The dry mixture is gradually added to the water.

  • for 1 kg of mixture – 0.17 – 0.19 l of water;
  • for 20 kg of mixture – 3.40–3.80 l of water
  • for 25 kg of mixture – 4.25 – 4.75 liters of water.
  1. Stir until smooth**.
  2. Wait 3-5 minutes until all chemical reactions are completed.
  3. Stir again

** Mixing is recommended to be done using a special mixer for dry mixtures or conventional drill with nozzle, speed no more than 500 per minute. At a high number of revolutions, the mixture will involve a large number of air, which can negatively affect the quality of the surface - the formation of bumps and craters is possible.

Attention! The properties of the product are guaranteed only if the proportions of mixing with water and the procedure for preparing the solution are strictly observed.

The mixture must be consumed within 1 hour from the moment of preparation.

  1. Install the beacons parallel to each other, so that during application and leveling they are like rails for the rule that will be used to level the mixture. It is prohibited to install beacons on gypsum mixture; it is recommended to use a quick-hardening mixture, for example, Bergauf Easy Master.
  2. It is necessary to stick damper tape around the perimeter of the room (the height of the tape should be 1 cm greater than the thickness of the Bergauf Base application, minimum thickness tape 5 mm).
  3. After preparing the solution, distribute it evenly between the beacons using a trowel or spatula. Application must be done from the far corner (in relation to the doorway), gradually moving towards the exit.
  4. The thickness of the application should exceed the height of the beacon by 1-3 mm.
  5. After distributing the solution, it is necessary to level it using the trapezoidal rule.
  6. Place the rule on the beacons, and then, without breaking away from the beacons, pull it “towards you,” holding the rule at an angle of 60°.
  7. Remove the remaining mixture remaining on the rule with a trowel and reuse.
  8. Expansion joints are created 24 hours after the floor is applied.
  9. Expansion joints should be perpendicular to each other, the area between the seams should, if possible, coincide as much as possible with the shape of a square. The distance between parallel seams should be 3-6 m, the width of the seam should be 3-5 mm, the depth should be a third of the thickness of the screed. The seams must coincide with the axes of the columns and the seams of the floor slabs.
  10. Before further work(laying the covering, pouring the finishing floor) the seams are filled with mortar leveler Bergauf Base or other suitable product.

When installing a heated floor, you should be guided by SP 29.13330.2011.

Attention!

When installing floors in rooms with complex geometric shape It is necessary to cut expansion joints after the mixture has hardened. Expansion joints must be arranged in doorways, narrowing in rooms with an irregular geometric shape and with a diagonal of more than 10 meters. Also, when installing the floor, you should repeat the existing ones in the base. expansion joints.

During the hardening period (the first 5-10 days after pouring), avoid drafts in the room and direct contact with the surface. sun rays so as not to cause premature drying of the floor and the appearance of cracks.

Passage on the leveled surface is possible after 48 hours*.

Turning on the “Warm Floor” is possible no earlier than after 14 days.

Before installation finishing coatings the surface can be leveled self-leveling floors Bergauf.

Surface suitable for:

- Bergauf Hydrostop waterproofing devices - in accordance with the instructions on the packaging;

— laying tiles of all types and sizes – after 5 days*;

- filling with finishing cement and gypsum mixtures— after 14 days;

- laying carpet, linoleum, etc. roll coverings- after 7 days (the residual humidity of Bergauf Base should be no more than 2%).

- laying parquet, laminate, parquet board etc. - after 14-21 days, depending on the drying conditions (the residual moisture content of Bergauf Base should be no more than 1.5%).

Guarantee period storage in a dry place and in closed original packaging is 12 months from the date of manufacture.

The manufacturer is not responsible for non-compliance with the technology for working with the material, for its use for purposes and conditions not provided for in these instructions, as well as in the case of the introduction of foreign components and substances into the composition
product.

Do not allow material to come into contact with eyes or Airways.

Cement floor screed BERGAUF ERSTE GRUND ("Berhauf Erste Grund") used for rough leveling of floors with differences from 10 to 80 mm for subsequent laying of tiles, porcelain stoneware and natural stone. Applicable manual application in rooms with normal and high humidity(bathroom, swimming pool, etc.), as well as for outdoor work.

Erste Grund leveling screed is recommended for balconies, loggias and terraces, as well as for rooms and open areas with significant seasonal temperature changes environment. The possibility of using the product for other outdoor work should be checked with a technical specialist.

KEY PROPERTIES

COMPOUND

The composition of the ERSTE GRUND screed includes cement binder, fractionated sand, mineral fillers, and modifying polymer additives.

CONSUMPTION

Consumption Bergauf screeds ERSTE GRUND is 1.8 - 2.0 kg per 1 m2 with a layer thickness of 1 mm

REQUIREMENTS FOR THE BASE

  • The base must comply with the requirements of SP 29.13330.2011 and SNiP 3.02.01-87.
  • The base must have a grade strength of at least M 150.
  • The surface of the base must be cleaned of dirt and dust, paint and varnish coatings and glue, peeling old coatings and oil stains - anything that can impair the adhesion of the material to the base.
  • Weak areas of the base, protrusions and irregularities must be removed by grinding or milling.
  • All cracks, deep potholes in the base, joints of slabs must be filled out, cleaned of dust, treated with Bergauf TIEFGRUNT primer and filled with a thickly diluted mixture of Bergauf Erste Grund a day before the start of floor leveling work.
  • The prepared base must be treated with Bergauf TIEFGRUNT primer
  • Dry and highly absorbent substrates must be primed twice. Allow the first coat of primer to dry for 1 hour before reapplying. Floor installation work should be carried out no earlier than 4 hours.

OPERATING PROCEDURE

  1. Install the beacons so that during application they are like rails for the rule that will be used to level the mixture.
  2. It is necessary to stick damper tape around the perimeter of the room.
  3. Distribute the solution evenly between the beacons using a trowel or spatula.
  4. The thickness of the application should exceed the height of the beacon by 1-3 mm.
  5. Align it using the trapezoidal rule.
  6. The rule is to put it on the beacons, and then extend it “towards you”
  7. Remove the remaining mixture on the rule with a trowel and reuse.
  8. Expansion joints are created 24 hours after the floor is applied.
  9. Expansion joints must be perpendicular to each other, the area between the joints
  10. Before further work, the seams are filled with a solution of Bergauf Erste Grund leveling agent.

Delivery cost at the entrance of the TTK (Third Transport Ring) + 500 rubles

Delivery cost at the entrance to the Garden Ring + 1000 rubles

The cost of entry into the center of Moscow for cars over 3 tons is negotiable

Delivery cost outside the Moscow Ring Road + 30 rubles per 1 km up to 1.5t; 40 rubles per 1 km from 3t; 45 rubles per 1 km from 5t

Payment:

To the courier (in the office or upon delivery)

Map on the website

Cashless payment

Characteristics

Wholesale price

Price from 40000 255

Discount price

Similar products

Similar products (sections)

Related products

Related products (sections)

Brand Bergauf

Add. photo 20812

Series

Fast-hardening

Country of Origin

Viability of solution

Minimum application temperature

Maximum application temperature

Consumption

Hardening time

Walking through

Shelf life

The basis

Layer thickness

Room

Flooring

High strength

Antistatic

Finishing

Base material

Application area

Weight 25 kg

Color

Type of work

Frost resistance

Moisture resistance

Color

Compressive strength

Two-component

Collection

Base material

Application area

To order

Panel length

Panel width

Panel thickness

Description

Description of the Bergauf Base screed

Self-leveling floor "Bergauf Base" is intended for finishing and decorative leveling horizontal surfaces in rooms with normal and high humidity. Available in 25 kg craft bags.

Key benefits:

  • non-shrinkability;
  • plastic;
  • application layer up to 50 mm;
  • resistance to cracking;
  • compatibility with underfloor heating systems
  • Possibility of walking after 48 hours.

Compound

Mixture for preliminary leveling of floors cement based

Packaging: 25 kg per package


Catalog - building mixtures Bergauf (Bergauf) (.XLS)
Excel file for saving on your computer
Catalog - building mixtures Bergauf (Bergauf) (HTML)
Web page (opens in a new window)

Price on request *

Minimum order quantity for dry mixes: 3 tons!

Specifications mixtures for preliminary leveling of Bergauf Base floors:
Color grey
Astringent cement
Maximum sand fraction up to 1.25 mm
Consumption of dry mixture per 1 m 2 with a layer of 10 mm 18-20 kg
Minimum layer thickness 5 mm
Maximum layer thickness 50 mm
Maximum layer thickness for partial leveling 60 mm
Viability of the finished solution in an open container 30 min
48 hours
Laying floor coverings (depending on the type of covering) from 7 days
Time to fully gain strength 28 days
Carrying out work at base temperature from +5 °С to +25 °С
Brand strength M 150
Compressive strength (after 28 days) 15 MPa
Flexural strength (after 28 days) 2.5 MPa
Strength of adhesion to the base (after 28 days) 0.5 MPa

Scope of application of the mixture for preliminary leveling of Base floors

To implement cement screed the best way Bergauf Base mixture is suitable. Application modern material will facilitate the process of leveling the floor. Bergauf Base mixture is applied in an even layer from 6 mm to 50 mm. It is intended for application to reinforced concrete slabs ceilings or monolithic concrete, base (rough) screed, self-leveling floors, “warm floors”, chipboard, gypsum fiber board, wood, expanded clay (if used as a rough screed and with appropriate preparation of the base). The uniqueness of the mixture Bergauf Base also lies in the possibility of its use in rooms with both normal and humidity exceeding 60% (for example, a bathroom, bathhouse, etc.).

Dry composition construction mixture Base

The composition of the Bergauf Base mixture includes: cement binder, mineral fillers, fractionated sand and modifying polymer additives.

When storing the material in sealed original packaging in a dry room, the manufacturer guarantees the preservation of all quality characteristics BERGAUF mixtures Base for 1 year from the date of its release.

Applying mixture for preliminary floor leveling Base

To obtain a high-quality flat Base floor, a number of requirements must be met. The base of the floor must have grade strength, with indicators not less than M 100. To ensure better adhesion of the mixture to the floor surface, the latter must be cleaned of dirt and dust (including construction), oil and greasy stains and damaged old coatings. Carrying out floor cleaning measures improves the adhesion of the material to the base. In addition, the prepared base should be treated with a primer; “Bergauf” (“Tiefgrunt” or “Primer” - depends on the specific type of base) is best suited.

No mixture preparation required special effort and time. It is necessary to mix the mixture with water (the water temperature should be in the range +5°C - +25°C) in the following proportion: for one kilogram of the mixture you will need ≈ 0.17 - 0.19 liters of clean (tap) water; and for 25 kilograms of dry mixture, respectively, ≈ 4.25 - 4.75 liters of water. After stirring the mixture until smooth, wait 4 - 5 minutes. After repeated mixing, the solution is ready for its intended use.

The manufacturer draws the attention of its consumers to the need to strictly adhere to the proportions of dilution with water and the progress of preparing the solution. Compliance becomes the key for long years use of the future floor!

It is unacceptable for the mixture to enter the respiratory tract and eyes of a person!

Manufacturer recommends manual method applying the mixture. After applying the prepared Bergauf Base solution to the prepared base, it must be distributed evenly. Leveling the surface can be done using a construction spatula or a rule.

In the case of pouring bases with complex geometric shapes, it will be necessary to organize special expansion joints (or introduce compensating materials into the structure of the poured floor, or cut appropriate long holes (seams) immediately after setting applied mixture). Such expansion joints must be provided in doorways, on planes with a diagonal measurement of 10 meters or more, and in narrow parts in rooms with an unusual geometric shape.

Cement hardening period Bergauf ties Base takes two weeks after pouring. These days, you need to avoid direct sunlight and drafts in the room being repaired on the surface of the screed.